<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1994804767464638&amp;ev=PageView&amp;noscript=1">

Statkraft | Stronger together

The Establishment of Quality Management system for Starkraft. The main objective of this project was to establish an applicable instrument to secure a high standard of quality in wind projects.

Norwegian Xrgia and Danish K2 Management have jointly established a Quality Management System for Statkraft’s offshore wind operations.  Xrgia and K2 Management have collaborated on several Statkraft projects in the past.  

The main objective of this project was to establish an applicable instrument to secure a high standard of quality in offshore wind projects.

You might also be interested in

Gode Wind II | Offshore Project Management

From 2009 to 2011 K2 Management helped PNE Wind develop the 240 MW offshore Gode Wind II project, located in the German North Sea.

iKR | K2 Management performs design review of substation

In September and October 2013 we helped our client KEPCO/iKR with a design review of a substation for the upcoming South West offshore wind farm. We are pleased to have received this statement from our client:

ESB Wind Development | CFD and noise modelling

Development support and energy yield assessment for 120 MW Grousemount Wind Farm incorporating CFD and noise modelling

Borssele I & II offshore wind farms | independent energy production estimate

Full independent energy production estimate of Borssele I & II offshore wind farms for submission as part of a Government-led competitive tender process.

RATCH Australia Corporation | independent energy yield assessment

Independent energy yield assessment of a 42 MW (AC) solar farm in Australia, on the site of a decommissioned coal-fired power station. K2 Management was appointed to undertake an energy yield assessment of the Collinsville Solar Farm following the successful award of $9.5m AUD to RATCH in the latest round of ARENA grant funding.

Dominion Energy | Offshore wind decommissioning cost study

In 2018, we were commissioned by Dominion Energy Virginia to deliver a decommissioning cost estimate for the proposed Coastal Virginia Offshore Wind Initiative – a 12 MW offshore wind project on the US east coast. 

Wave energy converter benchmarking study | Carnegie Wave Energy

K2 Management* was commissioned to conduct a benchmarking study for Carnegie Wave Energy to investigate a range of performance and load metrics suitable for benchmarking with alternative wave energy converter (WEC) types.

Wave & tidal technical due diligence | AW-Energy

AW-Energy appointed K2 Management* to undertake a wide range of activities, including technical due diligence and second-party support in a range of engineering disciplines.

Supporting EU wave energy project to important milestone

As a partner in the EU project Horizon 2020 MegaRoller, K2 Management has had a key role in answering some of the questions surrounding wave energy. The project has a team of participants from across the industry with a collective aim of driving forward understanding of wave technology.

Advising ESB in 50% stake in Neart Na Gaoithe

ESB appointed K2 Management to support them in acquiring a 50% stake in the 448 MW Neart Na Gaoithe offshore wind farm.

K2 Management advises on bp's first offshore wind venture

K2 Management delivered acquisition due diligence services in support of bp’s first step into the offshore wind market – a 50% stake in Equinor’s Empire Wind and Beacon Wind assets.

Our role on the acquisition of Denmark’s largest onshore wind farm

Utility, AURA Energi’s subsidiary AURA VE, engaged K2 Management to provide due diligence services to support the acquisition of a 50% stake in the biggest onshore wind farm in Denmark.

Let us know what's on your mind

 
Got something to say, but not sure who to say it to?

Getting in touch is easy - just fill out this form and we'll put you in touch with the right person.